Proposed Sidewalks Project Scope- Investment

AttachmentSize
MDOT Sidewalk Grant Investment Table_11-24-09.doc50 KB

 

PRIORITY #1

ID #

Road

Location

Description

Feet

Cost

1

Center Street

Main Street to Post Road

4-ft (min) sidewalk with 20 foot travel way

2,100

 

2

School Street

Main Street to Town Hall

4-ft (min) sidewalk from Main Street to Town Hall, then along the side of Town Hall to the rear parking area and Municipal Building

350

 

3

Main Street,    south side

Back Hill Street to School Street

4-ft (min) sidewalk and 4-ft shoulder

300

 

4

Main Street, north side

River Road to Center Street

4-ft (min) sidewalk with 4-ft shoulder.  Create five parallel parking spaces along the town-owned property across from the credit union.

800

 

5

Main Street,    south side

River Road to Credit Union

4-ft (min) sidewalk with 4-ft  shoulder

150

 

7

River Road   (Rt 24)

Main Street to Ridge Road

4-ft (min) sidewalk and paved shoulder

750

 

8

River Road   (Rt 24)

Main Street to Cathance River Bridge

4-ft (min) sidewalk and paved shoulder

950

 

11

Alternative to River Road #8 (if necessary)

Lower Main Street and Mailly Waterfront Park

From Mailly Waterfront Park to the River Road construct a 4-ft (min) sidewalk and create a 9-foot wide shoulder for parallel parking along the Town Landing Restaurant property boundary and then through Mailly Waterfront Park to  the existing sidewalk on the Cathance River Bridge.

600

 



 

PRIORITY #2

ID #

Road

Location

Description

Feet

Cost

6

Ridge Road

River Road to existing sidewalk on Cemetery Road

4-ft (min) sidewalk

950

 

9

Bay Road     (Rt 24)

Approx. 500ft from Cathance River Bridge

4-ft (min) sidewalk and paved shoulder

500

 

PRIORITY #3

ID #

Road

Location

Description

Feet

Cost

10

Bay Road     (Rt 24)

#9 to Wallentine Road

4-ft (min) sidewalk and paved shoulder

1200